Diagrams, Figure 2 figure 3, The unit is now ready for operation – Lincoln Electric BIG RED IM10019 User Manual
Page 35
Advertising
F-2
DIAGRAMS
F-2
BIG RED™ 600
M22253
A
4.
LOCATE LEADS 3D & 6J. (SEE FIGURE 2). CUT BOTH LEADS AS SHOWN.
5. STRIP ALL FOUR LEADS 13MM (.50 in.)
6.
CONNECT LEADS FROM CIRCUIT BREAKER & RECEPTACE TO RCD AS SHOWN
& TIGHTEN LEADS TO 2.4NM (21 in-lb). (SEE FIGURE 3). NOTE LEAD
CONFIGURATION. COAT AREA WHERE LEADS CONNECT TO RCD WITH A
SILICONE RUBBER RTV SEALANT.
7. MOUNT RCD & PROTECTIVE BOOT TO PANEL USING MOUNTING BRACKET &
SCREWS SET ASIDE IN STEP 3.
8. SECURE LOWER CONTROL PANEL IN PLACE.
9. RECONNECT NEGATIVE BATTERY CABLE.
THE UNIT IS NOW READY FOR OPERATION
CIRCUIT
BREAKER
FIGURE 2
FIGURE 3
RCD OPENING
CUT LEADS
RCD
3D
6J
6J
3D
3D
6J
3D
6J
240V RECEPTACLE
240V
RECEPTACLE
REAR VIEW
FRONT VIEW
PROTECTIVE
BOOT
Advertising