Typical piping applications (cont.) – Lochinvar VAL2123 User Manual

Page 3

Advertising
background image

3 of 8

Typical piping applications (cont.):

Figure 6_Primary /Secondary Piping of a Single Boiler - 2" Valve

Figure 7_Primary/Secondary Piping of Multiple Boilers - 2" Valve for each boiler

Note: Valve must be installed with proper port orientation.
Failure to observe port markings on the valve body prior to
installing the valve could result in damage to the unit.

NOTES:

1) Unit(s) high limit must be set at max.

2) Inlet and outlet connections to the boiler are shown for reference only. Actual connections may vary

from those represented here. Consult the Installation and Service Manual for actual locations.

3) Unit(s) pump should operate only during firing periods.

*Best practice for Indoor/Outdoor reset.

**Best practice for set point operation.

DETAIL

DET

AIL

NOT

TO

EXCEED 4 PIPE DIA.

OR

A MAX. OF 12”

AP

AR

T

C = SYSTEM
RETURN
WATER

B = FROM
BOILER
OUTLET

A = BLENDED
WATER

NOTES:

1) Unit(s) high limit must be set at max.

2) Inlet and outlet connections to the boiler are shown for reference only. Actual connections may vary

from those represented here. Consult the Installation and Service Manual for actual locations.

3) Unit(s) pump should operate only during firing periods.

NOT

TO

EXCEED 4 PIPE DIA.

OR

A MAX. OF 12”

AP

AR

T

INS7238 Rev C

Advertising
This manual is related to the following products: