Hydronic piping – Lochinvar CREST 3.5 User Manual

Page 25

Advertising
background image

Installation & Operation Manual

5

Hydronic piping

(continued)

It is required that boiler piping systems
utilize Primary/Secondary or Full Flow
configurations as shown in FIG.’s 5-2
thru 5-5. The use of other boiler piping
configurations could result in improper
building and system flow rates leading to
inadvertent boiler high limit shutdowns and
poor system performance.

NOTICE

The pressure drop reflected in FIG. 5-1 is
for the boiler only. Additional allowances
must be made for piping, especially if
sizing pumps for Primary/Secondary
applications.

NOTICE

TEMPERATURE RISE APPLICATIONS

Model

BOILER

CONNECTION SIZE

20°F 40°F

60°F

GPM

FT/HD

GPM

FT/HD

GPM

FT/HD

FB 1500

4"

138

3.4

69

1.5

46

1.0

FB 2000

4"

184

4.1

92

1.6

61

1.0

FB 2500

4"

230

4.6

115

1.3

77

0.7

FB 3000

4"

277

5.6

138

1.2

92

0.7

FB 3500

4"

323

7.5

161

1.2

108

0.7

0

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

0

50

100

150

200

250

300

350

FBN1500
FBN2000
FBN2500
FBN3000
FBN3500

Flow Rate (GPM)

P

ressu

re

D

ro

p

(F

eet

o

f H

e

ad

)

CREST Pressure Drop Curve

Figure 5-1 Pressure Drop vs. Flow

Table 5A Sizing Information for Temperature Rise Applications_20°F, 40°F and 60°F

25

Circulator sizing

The Crest heat exchanger does have a pressure drop, which must be considered in your system design. Refer to the graph in
FIG. 5-1 for pressure drop through the Crest heat exchanger.

[Based on 92% AHRI Effi ciency]

Advertising