Lennox International Inc. Electric Cooling Package Unit (2/4)SA13 User Manual

Page 7

Advertising
background image

# 48392M005

Page 7

OPERATION

Sequence of Operation

Cooling

Upon cooling demand, the thermostat closes circuit R and Y.
Closing R and Y closes the unit contactor, starting the
compressor and outdoor fan. The thermostat automatically
closes R to G circuit which also brings on the indoor blower at
the same time. Upon satisfying cooling demand, the thermo-
stat will open the above circuits and open the main contactor,
stopping the compressor and outdoor fan. If the unit is
equipped with a delay timer, the blower will continue to
operate for 90 seconds which improves system efficiency.

Circulating Air Blower

The circulating air blower is controlled by a timing circuit in the
blower control. Timings are not adjustable.

There is no blower “on” delay after a call for heating or
cooling. Blower “off” delay is 90 seconds after the thermo-
stat is satisfied.

Cooling System Performance

For maximum performance of the cooling system, operat-
ing temperatures and pressure should be checked. Super-
heat should be determined at Standard ARI test conditions
of 82°F outdoor and 80°F indoor dry bulb/67°F wet bulb. If
superheat measured deviates from values found in Table 3,
refrigerant charge should be adjusted accordingly for
maximum performance.

Suction Superheat

Table 3

e

z

i

S

t

a

e

h

r

e

p

u

S

n

o

i

t

c

u

S

s

n

o

i

t

i

d

n

o

C

I

R

A

@

B

W

D

I

°

7

6

/

B

D

D

I

°

0

8

-

D

O

°

2

8

2

2

R

A

0

1

4

4

2

°

2

2

°

5

1

0

3

°

0

2

°

5

1

6

3

°

0

2

°

2

1

2

4

°

0

2

°

2

1

0

6

,

8

4

°

0

2

°

0

1

Advertising