2 installing the switch – Planet Technology GSW-2401 User Manual

Page 9

Advertising
background image

LNK/ACT Green Lights to indicate the link through that port is

successfully established.
Blinks to indicate that the switch is actively sending or
receiving data over that port.

1000 Green

Lights to indicate that the port is operating at
1000Mbps.

100 Green

Lights to indicate that the port is operating at 100Mbps.

2.1.4 Switch Rear Panel

Figure 2-3 & 2-4 shows a rear panel of GSW-2401/GSW-1601.

100 ~ 240V AC

50/60 Hz

Figure 2-3 GSW-2401 front panel

100 ~ 240V AC

50/60 Hz

Figure 2-4 GSW-1601 front panel

Power Notice:

1. The device is a power-required device, it means, it will not work
till it is powered. If your networks should active all the time, please
consider using UPS (Uninterrupted Power Supply) for your device.
It will prevent you from network data loss or network downtime.

2. In some area, installing a surge suppression device may also
help to protect your switch from being damaged by unregulated
surge or current to the Switch or the power adapter.

2.2 Installing the Switch

This part describes how to install your Gigabit Ethernet Switch and
make connections to it. Please read the following topics and perform
the procedures in the order being presented.

Advertising