Configuring and testing inband management, A-39 – Paradyne U8777 User Manual

Page 135

Advertising
background image

A. Configuration Options

8700-A2-GB20-40

May 2002

A-39

Configuring and Testing Inband Management

The Model 8779 Termination Unit allows you to set up remote inband
management using one of the DS0 channels as the management channel to
transport SNMP traffic to the MCP card.

Procedure

To set up inband management for the 8779 unit:

1. Ensure that MCP card is operating with firmware release M04.03.19 or later

and that the 8779 unit is operating with firmware release A02.03.22 or later.

2. Configure the MCP card for inband management using a console session (not

Telnet session). From the MCP card, follow this menu selection sequence:

Main Menu

Configuration

Ports

Ethernet Port

The Ethernet Ports screen appears.

3. Enter Internal for Management Port Type and the slot number of the 8779 unit

to be tested for Management Port Card/Slot #. Then Enter yes to reset the
port and save your changes.

4. Use the Cross Connect Mode screen on the 8779 unit to configure the G.703

port to be used for inband management as a DS0 cross-connection. From the
8779 unit, follow this menu selection sequence:

Main Menu

Configuration

Current Configuration

Cross Connect

Set Cross Connect Mode

Advertising
This manual is related to the following products: