8.0 Completion & Commissioning

8.1

Completion

1. Seal off any secondary openings within the builders
opening after wrapping the gas and water pipes through the
brickwork and within the opening itself. (B.S. 5871 Part 1).

2. Take the Boiler Control from the firefront packaging and
connect it to the boiler (Fig. 38).

8.2

Commissioning the Boiler

1. Reference should be made to BS 5449 Section 5 when

commissioning the boiler.

2. At the time of commissioning, complete all relevant

sections of the Benchmark Checklist at the rear of this

publication.

IMPORTANT: The heat exchanger air vent on top of the

boiler (Fig. 38) MUST be opened before filling the

primary system.

3. Ensure all valves in the water system are turned on.

4. The system must be flushed in accordance with BS 7593

(see Section 5.2) and the flushing agent manufacturers

instructions.

5. Turn the gas supply on and purge according to in GB BS

6891 and in IE I.S. 813 "Domestic Gas Installations".

6. Test for gas soundness.

7. Ensure all external controls e.g. room stat, timer etc. are

calling for heat and turn on the mains electrical supply. Turn

the rocker switch at the top right of the boiler to ON. The

fan and condensate pump will run briefly.

8. The display will count down from 7 to 0, then the current

water temperature will be displayed.

9. When there is a demand for heating the bar on the top

left of the display will be shown and the boiler will

commence the ignition sequence.

10. When ignition is established the ‘flame’ symbol on the

display is illuminated. The display will indicate the flow

temperature. The appliance is fully preset, therefore no

adjustment is required.

11. If the boiler fails to ignite within the three ignition

attempts the error code E133 will appear in the display, ‘E1’

alternating with ‘33’.

12. To reset the boiler press the reset button for at least 3

seconds. The ignition sequence will then recommence. A

maximum of four resets in a five hour period are allowed.

13. When the reset button is activated the number of

available reset attempts will be displayed

Auto Air
Vent

ON/OFF

Fig. 38

Fig. 39

Fig. 40

Service
Reset

Countdown

Current Temp.
& Demand

Burner Lit

Remaining
Resets

Advertising