Paradyne Uplink Interface Module UIM-10/100 User Manual

Installation instructions

Advertising
background image

220-0000016 rev01

UIM-10/100

Uplink Interface Module

INSTALLATION

1. Unpack and inspect the equipment.

The following components should be included:

If there is visible damage, do not attempt to connect the device; contact Customer Support at 1-877-
638-2638 (001-603-427-0600 for international customers) or [email protected].

2. Install the UIM-10/100.

Required tool for installation: Phillips screwdriver.

UIM Installation in an IP DSLAM

Affix the UIM to a Multiplexer Uplink Module (MUM).

a. Place the MUM on a flat surface with the circuit board facing up.

b. Select a port on the MUM for UIM installation; either port (1 or 2) may be used.

Although not required for operational purposes, if redundancy is desired, two UIMs
may be installed on the MUM, one in each port.

Installation Instructions

CAUTION

Net to Net Technologies strongly recommends the use of proper electrostatic discharge (ESD) precautions when
handling this equipment.

!

1 UIM-10/100

!

4 #6 Phillips Panhead Internal Locking Screws

!

2 #6 Phillips Beige Flathead Screws

NOTE

The UIM may be attached to a MUM that has already been in service, although you must remove the
MUM from the IP DSLAM in order to do so. Removal of a MUM from an IP DSLAM chassis that is
powered up will not affect the operational status of other modules within the chassis; it
will, however, disengage the IP DSLAM's upstream network connection.

Advertising