Ta series, Illuminations, Top-access – Phantom Tech Projector User Manual

Page 2: Wire in, Install projector and cradle

Advertising
background image

ILLUMINATIONS

607 Durham Drive
Houston, Texas 77007-5316
Tel: 713-863-1133 / Fax: 713-863-0044

TA SERIES

TOP-ACCESS

INSTRUCTION SHEET

L i g h t i n g D e s i g n

LAMPING AND TRANSFORMER NOTES

5. INSERT TRIM

1. Make sure power is off.
2. Remove ceiling trim, projector and mounting cradle.
3. Remove junction box and disconnect supply wires.
4. Remove transformer from junction box and replace.
5. Splice transformer red leads to white socket leads.
6. Splice transformer black lead to thermal protector blue lead.
7. Splice transformer and thermal protector white leads to supply common leads.
8. Splice thermal protector black lead to supply black lead.
9. Replace junction box cover.
10. Reinstall projector mounting cradle, projector and ceiling trim.

Socket manufacturers have suggested that sockets may fail after 3 to 6 lamp changes. If this occurs the socket can be replaced
by disconnecting the fixture lead wires and replacing it with a new socket procured through PHANTOM LIGHTING.
In the event of a short circuit or overload, the transformer will automatically shut down the output. The transformer will automatically
reset as soon as the short is corrected.

LAMPING AND TRANSFORMER NOTES

This fixture contains an electronic transformer that may require the use of a special dimmer.

DIMMING NOTES

TRANSFORMER REPLACEMENT

Once you have cut your opening, remove the heat shield
temporarily to install your elongated trim into opening. Pull the
elongated trim back up to ceiling and bend the flanges down
for a tight fit against ceiling. Staple flanges to sheet rock to
secure. Install glare shield if desired. Replace the heat shield
back into position.

C

US

R

73355

WHITE

RED

12 VOLT

LEADS

WHITE

BLACK

BLUE

THERMAL

PROTECTOR

STRAIN RELIEF

DEVICE

75 WATT

ELECTRONIC

TRANSFORMER

SUPPLY 120V

BLACK

WIRE

GROUND

WHITE

7. WIRE IN

ETL LISTED, LUMINAIRES TO UL STD 1598
& TRACK LIGHTING TO UL STD 1574

Lower your projector cone into opening and position the
projector back at the desired angle. The cradle fits over the
projector to hold it into place. Install the projector into the cradle
with the three holes on the projector facing up and secure
using one black knob to the center hole. Insert pivot pegs into
pivot holes on cradle. This is your aiming angle pivot. Angle
projector to correct position and tighten the 2 black knobs on
sides of cradle. See projector supplement sheet for further
instructions regarding lens combinations and projector set up.

6. INSTALL PROJECTOR AND CRADLE

Pivot Pegs

Remove metal cover from junction box and inspect wiring
compartment. Install strain relief device(s) and bring SUPPLY
WIRES into junction box. Allow adequate slack in wire(s) to
pull J-BOX into housing for servicing transformer.
Connect

WHITE transformer and thermal protector lead to neutral
supply lead
. Connect
BLACK thermal protector lead to HOT

(120V) supply lead. Connect GREEN fixture wire to supply

ground lead. Place all electrical connections in J-BOX and close
the J-BOX cover. (See wiring diagram on bottom of page)

Advertising