Warning – Poulan Pro PP338PT User Manual

Page 20

Advertising
background image

20

CUTTERS MUST FACE IN

DIRECTION OF ROTATION

Tip of

Bar

Cutter

Drivelink

Cutters

Depth Gauge

Drive Links

8. Place chain over sprocket, fitting the

drive links in the sprocket.

9. Fit bottom of drive links between the teeth

in the sprocket in the nose of the guide

bar.

10. Fit chain drive links into bar groove.

11. Pull guide bar forward until chain is snug

in guide bar groove. Ensure all drive links

are in the bar groove.

12. Now, install bar clamp making sure the

adjusting pin is positioned in the lower

hole in the guide bar.

Adjusting Pin

Lower

Hole

Guide Bar

13. Install bar clamp nut and finger tighten

only. Do not tighten any further at this

point. Proceed to the CHAIN ADJUST-

MENT section.

CHAIN ADJUSTMENT

See CHECK CHAIN TENSION in MAINTE-

NANCE section.

REPLACING THE LINE

1. Press the tabs on the side of the trimmer

head and remove cover and spool.

Tab

Tab

Cover

Spool

2. Remove any remaining line.

3. Clean dirt and debris from all parts. Re-

place spool if it is worn or damaged.

4. Replace with a pre-wound spool, or re-

place line using a 25 feet (8 meters)

length of 0.080 inch (2 mm) diameter

Poulan PRO brand line.

WARNING:

Never use wire, rope,

string, etc., which can break off and become a

dangerous missile.

5. When installing new line on an existing

spool, hold the spool as shown.

6. Bend the line at the midpoint and insert

the bend into the slot in the center rim of

the spool. Ensure line snaps into position

in the slot.

Advertising