Carton contents, Assembly, Unpacking and cleaning – Porter-Cable 3802L User Manual

Page 7: Assembly tools required assembly time estimate

Advertising
background image

7

1.

Carefully remove the machine from the carton. Retain all packing materials until you have inspected and
satisfactorily operated the machine.

Do not operate this machine until you read and understand the entire instruction manual.

2.

Place the machine on a firm, level surface with extra room for handling and proper support of the workpiece.

3.

Familiarize yourself with all features and controls explained in this manual.

4.

The machine is shipped with the cuttinghead locked in the down position and the table rotated to 45° left, Fig. 2. To
release the head and move it to the operating position, see “MOVING CUTTINGHEAD TO THE UP POSITION” and
“MOVING THE TABLE TO THE 0° CUT-OFF POSITION” in this manual (Fig. 5 & 7).

Fig. 2

CARTON CONTENTS

Fig. 3

1.

Miter Saw

2.

Extension table

3.

Fence slide

4.

Fence slide support

5.

Dust bag

6.

1/2" Arbor and fence wrench

7.

1/4" hex wrench

8.

Open end 7/16" wrench

9.

Lock handle for sliding fence

10. 5/16" flat washer

11 5/16" lock washer

12 5/16 - 18 x 1 1/4" long hex head screw (2)

13 5/16 - 18 x 3/4" long hex head screws (2)

14. 1/8" hex wrench

1

2

3

4

5

6

7

8

9

10

11

12

13

14

UNPACKING AND CLEANING

ASSEMBLY

ASSEMBLY TOOLS REQUIRED

ASSEMBLY TIME ESTIMATE

1/2" arbor and fence wrench (supplied)
7/16"Open end wrench (supplied)

Assembly time for this unit is approximately 30 minutes.

Advertising