Selecting an installation option, Ups installation – Powerware 9150 User Manual

Page 24

Advertising
background image

Installation

20

Powerware

®

9150 User’s Guide

:

www.powerware.com

Selecting an Installation Option

In addition to the standard Powerware 9150, the UPS has an optional
PDM. Use the following flow chart to decide which installation option
is right for you.

No

See “UPS with
Optional PDM
Installation”
on page 25.

Yes

See the following
section, “UPS
Installation.”

Do you have an
optional PDM?

UPS Installation

The Powerware 9150 has the following power connections:
: 2-phase (L1/A and L2/B), neutral, and ground connection for

rectifier/bypass input

: 2-phase (L1/A and L2/B), neutral, and ground connection for load

output

The nominal input/output voltages are:
: 100/200, 110/220, or 120/240 Vac with 180• phase displacement
: 120/208 or 127/220 Vac with 120• phase displacement

W A R N I N G

Only qualified service personnel (such as a licensed electrician) should perform the
UPS installation and initial startup. Risk of electrical shock.

Advertising