4. Install jumper troughs between bases with two #12 sheet metal

screws (supplied).

P

AN

-P

UNCH

110 Tower System

NOTE: 300 PAIR TOWER SHOWN. INSTRUCTIONS ALSO APPLY TO THE 900 PAIR TOWER.

CABLE REQUIREMENT: Terminates most 22-26 AWG solid or stranded

IWC wire with a .050" (1.27mm) max. o.d., either PVC or Plenum rated.

1. Mount tower to wall using #12 wood screws (not provided) or

equivalent. Some applications will require different mounting
hardware. Ensure that the bottom of the tower is at least 8" from
the floor to provide space for horizontal cable manager trough.

2. Route cable bundle into tower and fan out individual cables into

their appropriate positions through the cutouts provided along the
tower leaving 12" to 18" of slack. Each cutout accommodates up
to 25 pair. Use cable ties to secure bundle to raised tabs on back
of tower.

3. Position base over slots in tower and secure with two #12

sheet metal screws (supplied). Place conductors into index
strip and install connecting blocks as per instruction sheet
PN51* (provided).