Ending an active test – Paradyne 7510 DSU User Manual

Page 42

Advertising
background image

Testing

5-10

7510-A2-GB20-10

November 1997

Ending an Active Test

A test initiated by the user can be ended by the user.

H

A Test Timeout option is available to automatically terminate a user-initiated
Loopback or Pattern test after it has been running a specified period of time.
Refer to Table A-1,

System Options

.

Test Timeout does not pertain to tests commanded by the:

— Network, such as the network-initiated CSU and DSU Loopbacks.

— DTE, such as the DTE-initiated Local Loopback.

H

On each test screen is a command column. Pressing Return when the cursor
is on the Stop command stops the test.

H

Use the Abort All Tests selection from the Test menu to stop all tests running
on all interfaces, with the exception of network or DTE-initiated loopbacks.
Command Complete appears when all tests on all interfaces have been
terminated.

Advertising