2 installing the switch – Planet Technology SW-804 User Manual

Page 10

Advertising
background image

10

Figure 2-4 SW-804 rear panel

2.1.3 LED Indicators

LED

Color

Function

PWR

Green

Lights to indicate that the Switch is powered
on.

LNK/ACT

Green

Lit: indicate the link through that port is
successfully established.
Blink: indicate that the Switch is actively
sending or receiving data over that port.

Power Notice:
1. The device is a power-required device, it means, it will not work till

it is powered. If your networks should active all the time, please
consider using UPS (Uninterrupted Power Supply) for your device. It
will prevent you from network data loss or network downtime.

2. In some area, installing a surge suppression device may also help

to protect your Switch from being damaged by unregulated surge or
current to the Switch or the power adapter.

2.2 Installing the Switch

This part describes how to install your Desktop Fast Ethernet Switch
and make connections to it. Please read the following topics and
perform the procedures in the order being presented.

Note

This Switch does not need software configuration.

Advertising
This manual is related to the following products: