Starting and stopping a test, Aborting all tests – Paradyne 9788 User Manual

Page 201

Advertising
background image

8. Troubleshooting

9700-A2-GB20-20

December 2002

8-17

Starting and Stopping a Test

Use this procedure to start, monitor, or stop specific tests. To abort all active tests
on all interfaces, see

Aborting All Tests

.

Procedure

To start and stop a loopback or set-pattern test:

1. Follow this menu selection sequence:

Main Menu

→Test

2. Select an interface and test (e.g., Network or Data Port PVC Tests) and press

Enter. The selected test screen appears. Start appears in the Command
column. Inactive appears in the Status column.

3. Select the DLCI number and press Enter if a PVC test has been selected.

The cursor is positioned at Start in the Command column of the first available
test. Start is highlighted.

4. Select the test you want to start and press Enter. Stop now appears and is

highlighted, and the status of the test changes to Active.

5. Press Enter to stop the test. Start reappears and the status of the test

changes back to Inactive.

6. View the length of time that the test has been running in the Result column.

Aborting All Tests

Use the Abort All Tests selection from the Test menu to abort all tests running on
all interfaces. To abort individual tests that are active, see

Test Timeout Feature

on

page 8-16

and

Starting and Stopping a Test

.

Procedure

To abort all tests on all interfaces:

1. Follow this menu selection sequence:

Main Menu

→Test

2. Select Abort All Tests and press Enter.

Command Complete

appears when all tests on all interfaces have been

stopped.

NOTE:

Abort All Tests does not interrupt DTE-initiated loopbacks.

Advertising
This manual is related to the following products: