NISSAN 999U7-VR002SP User Manual

Page 9

Advertising
background image

(7)

(8)

(9)

(10)

(11) Use an 8mm socket to remove the bolt. Insert the

eyelet connector. Tighten the bolt back down to
secure the eyelet. Fig. 21

Now the tape liner can be removed and the assembly
put into place. Fig 20

Tighten the large cable ties. Fig. 20

Position the assembly just in front of and at equal
height as the top of the hole in the metal frame. Apply
equal pressure to the module for at least 20 seconds.
After attaching to metal frame let the module sit for 5
minutes to ensure good adhesion before applying any
shear pressure. Fig. 20

Take the ground wire tapped off of the N-bus harness
and route towards lower bolt securing the fuse panel.
Fig. 21

Fig. 20

ARMADA,

QX56 &

TITAN

position at equal height and to
the front of these imaginary lines

small tab

Fig. 19

Fig. 21

bolt to attach
ground cable

ground cable

3.14.06

9/11

284-9798-100-I1

Advertising
This manual is related to the following products: