NEC NP4100 User Manual

NEC Projectors

Advertising
background image

5880 Sheridan Boulevard, Arvada, Colorado 80003

Ph: 303-412-0399 ▪ Fax: 303-412-9346

www.displaydevices.com

Ceiling Mount

1. Remove ¼”-20 button head bolt on ceiling plate to remove lower portion of mount.

2. Install the ceiling plate with (4) 5/16” bolts to structural attachment points. Lag screws

may be used when attaching to wood joists.

3. Reattach the lower portion of the mount.

4. Attach interface plate (pn 72-1073) to projector with (5) M4 x 10 pan head Phillips

screws.

5. Align interface plate into holes on mount, slide stand off bolts into slots and tighten. Add

center locking Torx cap screw which attach secures the interface plate to the mount.

6. Attach the wire safety rope to the interface plate with the enclosed coupler.

7. Attach power and signal cables to projector.

8. Adjust left-to-right yaw. When desired position is attained, tighten ¼”-20 ring on

coupler to mount.

9. Loosen tilt adjustment cap screw with enclosed tool and level the projected image to the

screen. Tighten cap screw when a level image is achieved.

10. Loosen up-down pitch adjustment cap screw with enclosed tool and adjust the pitch

angle of the projector. Tighten cap screw when at desired projection position.

11. If desired, add Kensington lock through the opening of the mount head, loop through

cable end and attach to projector.

4X

SEE NOTE

12

4X

3

2

4

5

6

10

9

8

7

4X

11

Advertising
This manual is related to the following products: