Figure 3 figure 4 – NuTone VAC PAN CI-365 User Manual

Page 3

Advertising
background image

INSTALLATION
OPTION #2 - IN WALLS ALONG BASE BOARDS

Refer to Figure 3 (ACCESS TO PIPING FROM BELOW)

1. Locate studs (1) in the wall at the location VacPan™ will be installed.

2. VacPan™ should be located tight to one side in stud space.

3. Drill a small reference hole (2) through the floor under area of VacPan™. This will establish location from basement.

4. From below, use hole saw to remove wood floor and wood plate at location of VacPan™ between studs in wall cavity to

provide access hole (3) from below.

5. Using a 1

1

/

2

" hole saw, remove a 6

3

/

4

" long slot (4) in baseboard tight to one stud.

Refer to Figure 4

6. Make wire connections to brass terminal and sprig terminal screws (5).

7. Secure VacPan™ (6) to baseboard using #6 screws provided.

8. From below, reach through hole (3) in stud space and push elbow (7) onto VacPan™ (6).

9. Make piping connections (8) as required to tie into existing central vac piping.

FIGURE 3

FIGURE 4

1

1

2

4

3

3

6

7

8

5