Figure 13. tie wraps – National Instruments CFP-CB-3 User Manual

Page 10

Advertising
background image

cFP-CB-1/2/3/4

10

ni.com

2. Tighten the strain-relief screws. If you are using the cushioned

strain-relief bar, make sure all the wires are secure against the
cushion and not touching metal parts of the connector block.

3. Reinstall the top cover and tighten the top cover screws.

4. Install tie wraps as shown in Figure 13.

Figure 13. Tie Wraps

Front View

Rear View

Advertising
This manual is related to the following products: