Unpacking procedure, Warnings – NEC 1160Xd User Manual

Page 9

Advertising
background image

Express5800/1160Xd/1320Xd Installation Procedures 5

Figure 1 shows the Model 1160Xd/1320Xd shipping container. The smaller
container (not shown) includes the following contents:

!

Server Stabilizer Kit

!

Accessory Box.

Figure 1. Shipping Container

Unpacking Procedure

Note:

It is recommended that you save the shipping

container, should the server require transport to another
location at a later date.

!

WARNINGS

Plastic straps securing the packaging may cause injury if the
belts snap loose when cut. Use caution when performing the
first step of this procedure, protecting the hands and face.

Handling the wooden unloading ramp and the pallet can
cause splinters. The use of gloves is recommended.

1. Move the server as close as possible to the computer room where the server

is to be installed.

2. Plastic straps secure the shipping box around the server. Carefully cut and

remove the plastic straps securing the sides and top of the shipping
container. See Figure 2A. It is recommended that you wear gloves and
protective eye wear when cutting the plastic straps.

Advertising
This manual is related to the following products: