Final system check – NuTone CV352 User Manual

Page 11

Advertising
background image

11

FLOOR

SUB-FLOOR

2

9

/

16

"

3

1

/

16

"

INLET

EXTENSION

FLOOR

INLET

FRAME

MOUNTING

BRACKET

SEAL

FLANGED

FITTING

FIGURE 36

CUT TO

LENGTH

EXTENSION

SLEEVE

FLANGED

FITTING

MOUNTING

BRACKET

FLANGE

FIGURE 37

WALL
INLET

EXTENSION SLEEVE

BRACKET

FLANGED FITTING

TUBING

FIGURE 38

FINAL SYSTEM CHECK

Be sure all inlets are closed and soil bag is in place. Check

switch on power unit for manual on/off operation.

Check each wall inlet to be sure contacts activate power unit

when hose is inserted. A short piece of wire can be used to
short contacts in wall inlet together to activate power unit. Check
each wall inlet and tubing connection for air leaks. Check power
unit for leaks around inlet tube and dirt receptacle.

Installer, will you please make sure a bag is installed in the

power unit. Remove the extra bag and owner's manual from the
power unit dirt receptacle and leave them with the cleaning
attachments for the convenience of the Home Owner…
Thank You.

Advertising