background image

12

Debugging Part Program

100

The different function and axis locking possibilities can be combined optionally. An axis, e.g. Z
axis and the functions can be locked simultaneously.

L

Note:

About the different locking possibilities turn to the machine tool builder for an information
material.

12.5 Test Run

Softkey TEST can be reached on OPERATOR’S PANEL or POSITION screens. After

pressing the action menu key

F5

CONDITIONS action menu must be selected, than

softkey TEST needs to be pressed.

If NCT machine control board is used select the

button.

The TEST state is indicated by caption TEST in the 8

th

field of the status bar.

When the key is activated:
– the interpolator does not command any movement on any axis towards the position control

loop, and

– no function is executed by the PLC.
The TEST state can be applied for
the syntactic and graphic test of
programs. The program execution
(the interpolation) is much faster
than it is in case of the simul-
taneous switched on state of
MACH LOCK and DRY RUN.
The position display and the
graphic position display show the
path done.

If

button TEST is

inactivated, than the current axis positions can be seen again in the position display of control.

L

Note:

Generally the TEST

button can be switched in one of the manual modes in case the

axes are in stopped state. For more turn to the machine tool builder for an information
material.