SECTION N: HI-DELTA INITIAL START-UP

1.0

TOOLS NEEDED

One 12-0-12, 24” scale manometer

6-0-6, 12” scale manometers

7/16” open end wrench

1/2” open end wrench

Screwdriver

Volt meter

3/16” Allen wrench

Jumper cable

2.0

PREPARATION FOR START-UP

WARNING:

DO NOT TURN ON GAS AT THIS TIME

2.1

Check Power Supply

With volt meter at incoming power check voltage between:
Hot - Common

(

~

120 VAC)

Hot - Ground

(

~

120 VAC)

Common - Ground

(< 1 VAC)

If Common - Ground is > 1 VAC - STOP: Contact electrician to correct ground failure. Warning: Failure to do this may
burn out 120V-24V transformer, or may cause other safety control damage or failure.

2.2 Attach Manometers to Measure Pressures

Attach 24" scale manometer to the first main gas shut-off valve pressure tapping.

Attach one 12" scale manometer to the outlet side of the second main gas shut-off valve pressure tapping.

Attach one 12" scale manometer to — Pull rubber tube from air pressure switch off the aluminum tubing and
connect the manometer using a tee.

Turn Off Main Gas Valve;

2.3 Check the Gas Supply Pressure

1.

Slowly turn on main gas shut-off valve;

2.

Read the gas supply pressure from the manometer; minimum supply pressure for natural gas is 5” W.C.,
recommended supply is 7” W.C., minimum supply pressure for propane is 11” W.C.

3.

If pressure is > 14" W.C.; Turn off the valve;

4.

Check if the service regulator is installed and/or adjust the service regulator;