Rancilio S20 User Manual

Page 80

Advertising
background image

80

6. INSTALLATION

The machine has feet that are adjustable in width
and depth in order to allow them to stand within
minimum and maximum areas (see overall
dimensions according to the model).

The surface must be well levelled, dry, smooth,
strong, stable and at a height of approximately 110
cm from the floor.

It does not need to be anchored to the surface and it
does not require any technical operations to dampen
vibrations in order to operate properly.

It is recommended to leave the area around the
machine free to facilitate its use and the performan-
ce of any maintenance operations.

If the machine is wet or very damp, wait until
it is completely dry before installing or using
it. It is always necessary to request an accu-
rate check by qualified service people in order
to find any possible damage to the electric
components.

Reserve an area near the machine for the installation
of the coffee grinding and dosage machine (see
relevant documentation).
The machine is usually equipped with a water
softener, type DP8 or DP12, which must be
connected by the user in compliance with the laws in
force. Should a different softener be installed, refer
to the documentation of the relevant product.
A dreg drawer should be fitted by the installer.

6.1. Connections to be made by the
user.

Connections must be carried out by quali-
fied personnel in full accordance with fed-
eral, state and local regulations.

6.1.1. Water and gas supply

(Fig.6)

Connections must be installed close to the machine.

● Water drainage pipe 1, having a minimum internal

diameter of 30 mm, equipped with a water-trap
accessible for inspection.

● Water supply pipe 2, with a 3/8"G cut-off tap.

● Gas supply pipe 3, with a cutoff tap.

The machine with gas heating must be
installed in compliance with current local
laws.

Fig. 6

Advertising
This manual is related to the following products:

S24, S26, S27