Raypak 503-2003 User Manual

Page 42

Advertising
background image

42

Air Pressure Switch

This heater is equipped with an air pressure switch to
prove the operation of the blower before allowing the
ignition control to begin a Call for Heat. It is located on
the right side of the lower flange of the blower mount-
ing assembly, directly behind the junction box.

Blocked Vent Switch

This heater is equipped with a blocked vent pressure
switch to prevent the operation of the heater when too
much of the vent is blocked. This switch is located on
the right side of the heater near the right rear corner.

UDB Diagnostic Board

This heater is equipped with a diagnostic board which
will indicate faults as they occur. It has the ability to
retain up to 256 faults in history. Refer to the Trouble-
shooting section for instructions on accessing,
reviewing and clearing these faults.

Fig. 42: Air Pressure Switch

Fig. 43: Blocked Vent Switch

SW1

SW2

Fig. 44: UDB Diagnostic Board

Advertising