Installation verification procedure – Raypak B6000 User Manual

Page 20

Advertising
background image

INSTALLATION VERIFICATION PROCEDURE

REGISTER
Before proceeding any further, please verify that the user registration form has been
completed and mailed (reference: Registration Card ).

MECHANICAL INSTALLATION
Verify installation has been completed (reference: Mechanical Installation ).

AIR TEMPERATURE SENSOR
Verify installation parameters have been met (reference: Air Temperature Sensor).

WATER TEMPERATURE SENSOR
Verify installation parameters have been met (reference: Water Temperature Sensor).

Verify System Control/Boiler Monitor power wiring connections.

Verify Torque Requirements.

Verify Air Temperature Sensor wiring, must be Belden #8132, #9842 or equivalent.

Verify Water Temperature Sensor wiring, must be Belden #8132, #9842 or equivalent.

Verify Power Test has been completed successfully.

Verify RS485 Communications Cable, must be Belden #9842 or equivalent.

Verify Boiler Monitor Select Switch (SW2) settings.

Verify Installation/Removal of Boiler Monitor Communications Jumper(s) [W1].

Verify Optional Boiler Monitor Control Wiring.

MODEM (Optional)

Perform and/or verify modem installation and hook-up per Raypak Add/On Options
P/N 240596 and B6000 BMS Optional Modem Software Documentation P/N 240595.

Page 20