Raypak 0030B User Manual

Page 26

Advertising
background image

26

FOR INTERMITTENT IGNITION (IID) WITH HONEY-
WELL OR ROBERTSHAW GAS VALVE (All Models)

1. STOP! Read the safety information above.
2. Set the thermostat to the lowest setting.
3. Turn off all electrical power to the appliance.
4. This boiler is equipped with an ignition device which

automatically lights the pilot. Do not try to light the
pilot by hand.

GAS CONTROL
KNOB SHOWN
IN "ON"
POSITION

GAS INLET

Fig. #8201.0

HONEYWELL

(Models 30 - 90)

5. For Honeywell valve: Turn gas control knob

clockwise

to "Off".

For Robertshaw valve: Push in and move gas
control lever to "Off" position.

6. Wait 5 minutes to clear out any gas. Then smell for

gas, including near the floor. If you smell gas,
STOP! Follow "B" in the safety information above
on this label. If you don't smell gas, go to the next
step.

7. For Honeywell valve: turn gas control counter-

clockwise

to "On".

For Robertshaw valve: Move gas control lever
to "On" position.

GAS CONTROL
KNOB SHOWN
IN "OFF"
POSITION

GAS INLET

Fig. #8199.0

ROBERTSHAW
(All Models)

8. Turn on all electrical power to the boiler.
9. Set thermostat to desired setting.
10. If the boiler will not operate, follow the instructions

"To Turn Off Gas To Boiler" and call your service
technician or gas supplier.

TO TURN OFF GAS TO BOILER

1. Set the thermostat at the lowest setting.
2. Turn off all electrical power to the boiler if service

is to be performed.

3. For Honeywell valve:

Turn gas control knob clockwise

to

"Off". Make sure knob rest against stop.
For Robertshaw valve:
Push in and move gas control lever to "Off"
position.

HONEYWELL PILOT

SHUT-DOWN PROCEDURE

To prevent freeze damage to the heating system, it

is recommended that the following system shut-down
procedure be performed.
1. Set the room thermostat to "OFF" or the lowest

setting.

2. Turn off all electrical switches to the boiler.
3. Turn off all gas valves supplying gas to the boiler.

Refer to operating instruction label on the boiler.

4. Shut-off the water supply to the boiler piping system

loop.

5. Open drain valve on the boiler to remove water from

the boiler and the piping circuits.

Note: It may be necessary to open the purge valves and/
or manual air vents to facilitate complete drainage of
water from the heating system.

Advertising
This manual is related to the following products: