Assembling the Front Frame

Figure I: Front Frame

1. Attach the Right and Left Doorway Studs (6,7)

to the Front Right and Left Crown Beams (2,3)

and the Front Floor Plate (17) as shown above.

The cutoff corners on the Studs should be at the

top and should face away from the center of the

greenhouse.

(See Figure I and right inset.)

2. Attach the Front Diagonal Stud (25) to

the lower Bolt on the Corner Bracket (13)

and bottom of the Front Floor Plate (17).

The flange should face inside.

(See Figure I.)

3. Attach the other Front Diagonal Stud (25)

in the same way on the opposite side.

4. Attach a Front Ceiling Plate (23) to the

Bolt (43) on the Corner Bracket (13) that is

right above the Diagonal-Bracket connection.

Connect the other end to the Left Doorway Stud (7).

Attach the remaining Front Ceiling Plate (23)

between the Corner Bracket (13) and Right

Doorway Stud (6).

(See Figure I.)

5. Attach the Top Doorway Beam (12) between

the Front Right and Left Crown Beams (2,3).

Turn it so that the nicked corners are facing up

and the two remaining holes are facing the outside

to allow the Door Rail (14) to be attached.

6. Attach the Vertical Extender (19) to the

Front Left Crown Beam (3) using the

Long Door Support Bolt (38) and Nut (52), with the

Door Support Spacer (39) between the Extender

and the Stud.

(See Figure I, left inset.)

7. Place three Bolts (43) in the Slot at the back

of the Door Rail (14). Attach the Rail to the

Top Doorway Beam (12) and the free end

of the Vertical Extender (19), with the

rounded side up.

(See Figure I.)