5 equipment, 1 power supplies, 2 loads – Texas Instruments SLUU477 User Manual

Page 5: 3 meters, 6 equipment setup, Test summary

Advertising
background image

BQ24210 EVM

HPA678

GND

J1

VBUS

J2

GND

BAT

APPLICATION CIRCUIT

U1

V

Iin

I

Power supply

#1

IBAT

V

Load #1

I

TS

PG

JP1

D1

LED

CHG

D2

J4

JP4

JP5

JP7

JP6

JP2

J3

JP3

www.ti.com

Test Summary

2.5

Equipment

2.5.1

Power Supplies

Power Supply #1 (PS#1): a power supply capable of supplying 20-V at 1-A is required.

2.5.2

Loads

LOAD #1 A 20V (or above), 1A (or above) electronic load that can operate at constant current and
constant voltage mode.

Or: equivalent.

2.5.3

Meters

Four Fluke 75 multi-meters, (equivalent or better)

Or: Two equivalent voltage meters and two equivalent current meters.

The current meters must be capable of measuring 1A+ current.

2.6

Equipment Setup

1. Set the power supply #1 (PS#1) for 6.5V ± 200mVDC, 1A ± 0.1A current limit and then turn off supply.
2. Connect the output of PS#1 in series with a current meter (multi-meter) to J1 (VBUS, GND).
3. Connect a voltage meter across J1 (VBUS, GND).
4. Connect Load #1 in series with a current meter to J2 (VBAT, GND). Turn off Load #1.
5. Connect a voltage meter across J2 (VBAT, GND).
6. Check all jumper shunts. JP1: OFF; JP2: OFF; JP3: OFF; JP4: OFF; JP5: connect 1-2 (External TS);

JP6: connect 2-3 (VBUS); JP7: connect 1-2 (charger OFF).

Figure 1. Original Test Setup for HPA678 (bq24210 EVM)

5

SLUU477 – December 2010

800mA, Single-Input, Single Cell Li-Ion Battery Solar Charger with Power Path

Submit Documentation Feedback

© 2010, Texas Instruments Incorporated

Advertising