Thermador HSB User Manual

Page 14

Advertising
background image

Page 14

Cabinet Installation:
(Figure 5)
Note: distances on page 10, Table

3.

1.

Find the centerline of the

cabinet bottom. Draw a line

along this centerline from rear

to front of the cabinet.

2.

Draw two lines, one at a K

distance from the wall, the other

one at a Z distance from the

previous line.

Mark 4 points , two along each

line at a distance of half W from

the center line, to determine

the screw locations.

3.

Fit 4 screws on cabinet bottom

do not tighten completely but

leave a space of about 1/2” from

cabinet bottom surface and

head screws.

4.

Run 8” Duct, long enough to

reach the transition once the

hood has been installed plus 1

1/2” inch for connect

ductwork.

Fix Duct to transition with

screws and seal with tape.

5.

If mounted, remove the

grease filter.

6.

Remove 1 of 2 knockouts and

install 1/2” conduit connector

in j-box.

7.

Hang the hood on screws

through side slots provided on

hood top.

Tighten the four screws.

If possible fix the hood on the wall at

4 additional point (2 on upper side,

2 on lower side).

INTEGRAL VENTILATOR
INSTALLATION
(Models VTN420B or VTN620B)
(see figure 9)

The Integral ventilator can be

mounted to discharge air as shown

on figure A and B at page 9.

It must be fixed through the slots of

the ventilator and pins with nuts of

the hood.

Tighten all four nuts.

Motor

connector

Integral ventilator

fixing point

Motor

support bracket

Figure 9

Advertising
This manual is related to the following products:

HS