Procedures – TAG CENTRIX SV-2000-X2 User Manual

Page 30

Advertising
background image


Operations Manual

SV-2000-X2 Server (CENTRIX /

JHSV)

Part Number: 1008080

Page 30 of 82

Version 1.4. 01/12/2010

6

Procedures

The procedures within this Chapter contain
relevant information to ensure your SV-2000-
X2 Server maintains its maximum performance
potential.

6.1 Server

Startup

1. Check to make sure that all the cables are

seated and connected correctly to the back of
the unit such as keyboard, mouse, monitor
VGA cable and both power cables.

2. Then Press the power switch ON to start the

computer (power switch is located in the front
of the unit)

3. Once the unit starts, System will go thru Power

On self Test (POST) (no action is required at
this time)

4. At windows dialog box press Ctrl, Alt, Delete

at once to login

5. Type in the correct user name and password

and then press enter to login

6. Once the operator is logged on to the unit they

could use the computer as they wish.

NOTE: Assuming the Server is not
connected to any network.

6.2 Server

Shutdown

1. The operator needs save any data that is

needed to be saved and then close application

2. Once all data is save and applications are

closed, click on Start menu, select shutdown
and then click OK to shutdown the computer.

6.3 Identifying Server Components Using Device Manager

The Device Manager is one of Windows' most
useful diagnostic tools. It lets you see all of the
devices attached to your computer, and which
resources they are each using. To access the
Device Manager do the following:

Advertising