GHND-SVX01A-EN • High Efficiency Propeller Fan Gas Unit Heater

Customer ______________________ Job Name & Number _________________________

PRE-INSPECTION INFORMATION

With power and gas off.

Type of Equip. Unit Heater, Duct Furnace, Indoor, Rooftop

Serial Number_________________________ Model Number __________________________

Name Plate Voltage:_____________Name Plate Amperage:_____________

Type of Gas: Natural or LP

Tank Capacity

_______ lbs. Rating: ______ BTU @ ____ °F

_______ kg _____ kw @ ____ °C

Are all panels, doors, vent caps in place?

Has the unit suffered any external damage? Damage ______________________________

Does the gas piping and electric wiring appear to be installed in a professional manner?

Has the gas and electric been inspected by the local authority having jurisdiction?

Is the gas supply properly sized for the equipment?

Were the installation instructions followed when the equipment was installed?

Have all field installed controls been installed?

Do you understand all the controls on this equipment? If not, contact your wholesaler
or rep.

(DO NOT START this equipment unless you fully understand the controls.)

GENERAL (with power and gas off)

Make certain all packing has been removed.

Tighten all electrical terminals and connections.

Check damper linkages for tightness.

Check all fans & blowers for free movement.

Check all controls for proper settings.

Check all set screws on blowers and bearings.

Check belt tightness.