Mounting hardware installation – TOA Electronics F-122CU User Manual

Page 5

Advertising
background image

5

5. MOUNTING HARDWARE INSTALLATION

Before mounting the speaker, determine the most appropriate method for the existing ceiling structure.

Be sure to use an optional HY-TB1 Tile Bar Bridge in combination with the supplied ceiling
reinforcement ring.

[Installation view on Drop Ceilings]

Because the bridge rails are 603 mm (23

47

/

64

") in length, be sure to match them to the ceiling tile size during

installation.

Caution
Set the bridge rails so that both ends fit securely into the T-grids, even if the ceiling tile accidentally falls off.

Ceiling tile

T-grid

Bridge rail

HY-TB1
(optional)

Ceiling reinforcement ring (accessory)

Reinforcement ring mounting screw

Tie-plate mounting screw

Tie-plate
(preinstalled on Bridge rail)

[Installation view on Dry Wall Ceilings]

Caution
Only install the Tile Bar Bridge on ceiling frames that can structurally support the weight of the speaker(s).

Ceiling panel

Reinforcement ring mounting screw

HY-TB1
(optional)

Bridge rail

Ceiling reinforcement ring (accessory)

Ceiling frame

Tie-plate mounting screw

Tie-plate
(preinstalled on Bridge rail)

Advertising