Programming, Tos-sn-1 – Toshiba Extended Panel TOS-SN-1 User Manual

Page 2

Advertising
background image

TOS-SN-1

Γ

For additional assistance, please contact Toshiba Adjustable Speed Drive Marketing Dept. at (800) 872-2192

Connect the Extended Panel to the inverter according to the procedure mentioned below.

1. Wait 10 minutes after the S11 is turned off to insure the drive is denergized. The

charge lamp can be used as a secondary indicator to determine if the drive is still
charged.

2. Connect the communication connectors of the extended panel to the inverter (CN1),

which has the common serial option (communication) connector, with the optional
cable.

3. Insure a secure connection is made between the inverter and the extended panel

once the connection is made.

4. Power on the inverter after connection has been made, and the display should turn

on.


Note: Before removing the cable, insure step 1 is confirmed.

Programming

Parameter

Description

Default Value

New Value

cmod

Command mode selection

1

Operational Panel

1

Operational Panel

fmod

Frequency setting mode selection 1

0

Built-in Potentiometer

3

Operational Panel














Advertising