Spring handles, Distribution blower & acc, Spin damper – United States Stove Company NITED STATES STOV 1602M User Manual

Page 7

Advertising
background image

7

USSC

SPRING HANDLES

Attach the four(4) spring handles to the Feed/Ash Doors,

Baffle Rod, and Shaker Rod by twisting the springs counter-

clockwise while applying pressure until you have screwed

them approximately 3/4”-1” onto the rods.

(4) Spring Handles

DISTRIBUTION BLOWER & ACC.

(2)

800 CFM Blower

(2)

Gasket, Blower

(8)

Tinnerman Clip, 1/4-20

(8)

1/4-20 x 3/4 Bolt

(2)

Conduit Assembly (5ft)

(1)

Honeywell Limit Control

(1)

Conduit Assembly (1ft)

(1)

Junction Box

(1)

Insulation (5” x 5”)

(1)

Rocker Switch

(1)

Romex Cable Clamp

(1)

Fan Center Control

(3)

73B Wire Nut

(1)

74B Wire Nut

(1)

Female Term. (blue)

(1)

Female Term. (red)

(8)

#10 x 1/2 Screw

1. Remove all contents and insure that all components

are present for assembly. See the part list below

2. Begin by attaching the blowers to the unit. Insert a

clip into each mounting hole in the furnace’s cabinet

back. Be sure to install the gasket between the blow-

er and cabinet back. Insert the eight bolts provided

and tighten.

3. Insert the adjustable snap-disc into the hole in the

upper-left hand corner of the cabinet back. Attach

using two of the #10 x 1/2 screws provided.

4. Find the Snap-Disc box, the small black box shown on

the left side in the illustration. Attach the shorter con-

duit assembly to the bottom of the box, securing it

with the nut on the fitting.

5. Plug the wires onto the snap-disc (see wiring sche-

matic) and then attach the box to the back of the

unit using four of the #10 x 1/2 screws provided.

6. Next, mount the junction box and insulation using two

of the #10 x 1/2 screws provided. Install the 5 x 5 insu-

lation between the cabinet back and junction box,

with the foil side to the cabinet back. Attach the con-

duit assembly from the snap-disc box to the junction

box as shown.

7. If not already installed, snap the rocker switch into the

top of the junction box.

8. Attach the two longer conduit assemblies to the junc-

tion box and to each blower.

9. Provide a 110v power supply and secure it with the

cable clamp to the right side of the box. Make all

wire connections per the wiring schematic in these

instructions using the supplied hardware. Mount the

junction box cover.

SPIN DAMPER

(1) Spin Draft

(1) 3/8-16 Carriage Bolt

(1) 3/8-16 Lock Nut

Screw the spin draft onto the 3/8” x 2-1/2” carriage bolt

followed by the 3/8”-16 lock nut. Then screw the spin draft

and bolt into the Combustion Air Inlet allowing approxi-

mately 1/2” of the bolt to stick through into the threaded

part of the tube. Secure the bolt in place with the 3/8”-16

lock nut by tightening it against the tube bracket.

Advertising