Alignment, Introduction, Required test equipment – Vertex Standard Yaesu VX-2R User Manual

Page 11: Alignment preparation & precautions, Test setup

Advertising
background image

11

Alignment

Introduction

The VX-2R is carefully aligned at the factory for the spec-

ified performance across the amateur band. Realignment

should therefore not be necessary except in the event of a

component failure. Only an authorized Vertex Standard

representative should perform all component replacement

and service, or the warranty policy may be void.
The following procedures cover the adjustments that are

not normally required once the transceiver has left the fac-

tory. However, if damage occurs and some parts subse-

quently are replaced, realignment may be required. If a

sudden problem occurs during normal operation, it is like-

ly due to component failure; realignment should not be

done until after the faulty component has been replaced.
We recommend that servicing be performed only by au-

thorized Vertex Standard service technicians who are ex-

perienced with the circuitry and fully equipped for re-

pair and alignment. If a fault is suspected, contact the deal-

er from whom the transceiver was purchased for instruc-

tions regarding repair. Authorized Vertex Standard ser-

vice technicians realign all circuits and make complete

performance checks to ensure compliance with factory

specifications after replacing any faulty components.
Those who do undertake any of the following alignments

are cautioned to proceed at their own risk. Problems

caused by unauthorized attempts at realignment are not

covered by the warranty policy. Also, Vertex Standard

reserves the right to change circuits and alignment proce-

dures in the interest of improved performance, without

notifying owners.
Under no circumstances should any alignment be attempt-

ed unless the normal function and operation of the trans-

ceiver are clearly understood, the cause of the malfunc-

tion has been clearly pinpointed and any faulty compo-

nents replaced, and realignment determined to be abso-

lutely necessary.

Required Test Equipment

The following test equipment (and familiarity with its use)

is necessary for complete realignment. Correction of prob-

lems caused by misalignment resulting from use of im-

proper test equipment is not covered under the warranty

policy. While most steps do not require all of the equip-

ment listed, the interactions of some adjustments may re-

quire that more complex adjustments be performed after-

wards.
Do not attempt to perform only a single step unless it is

clearly isolated electrically from all other steps. Have all

test equipment ready before beginning and, follow all of

the steps in a section in the order presented.

r

RF Signal Generator with calibrated output level at 500

MHz

r

Deviation Meter (linear detector)

r

In-line Wattmeter with 5% accuracy at 500 MHz

r

50-Ohm 10-W RF Dummy Load

r

8-Ohm AF Dummy Load

r

Regulated DC Power Supply adjustable from 3 to 15

VDC, 2A

r

Frequency Counter: 0.2-ppm accuracy at 500 MHz

r

AF Signal Generator

r

AC Voltmeter

r

DC Voltmeter: high impedance

r

UHF Sampling Coupler

r

SINAD Meter

Alignment Preparation & Precautions

A 50-Ohm RF load and in-line wattmeter must be con-

nected to the main antenna jack in all procedures that call

for transmission; alignment is not possible with an anten-

na. After completing one step, read the next step to see if

the same test equipment is required. If not, remove the

test equipment (except dummy load and wattmeter, if

connected) before proceeding.
Correct alignment requires that the ambient temperature

be the same as that of the transceiver and test equipment,

and that this temperature be held constant between 68 ~

86° F (20° ~ 30° C). When the transceiver is brought into

the shop from hot or cold air, it should be allowed some

time to come to room temperature before alignment.

Whenever possible, alignments should be made with os-

cillator shields and circuit boards firmly affixed in place.

Also, the test equipment must be thoroughly warmed up

before beginning.
Note: Signal levels in dB referred to in the alignment pro-

cedure are based on 0dBm = 0.5µV.

Test Setup

Set up the test equipment as shown below for transceiver

alignment, and apply 4.4 V DC power to the transceiver.

Refer to the drawings for Alignment Points.

8-ohm AF

Dummy Load

RF Signal

Generator

SINAD Meter

In-Line

Wattmeter

Deviation

Meter

50-ohm RF

Dummy Load

Frequency

Counter

AF Signal

Generator

Regulated

4.4 VDC P.S.

AF Signal Input

AF Signal Output

Advertising