Warning – Wayne-Dalton TORQUEMASTER 6100 User Manual

Page 33

Advertising
background image

Tools Needed:

33

Please Do Not Return This Product To The Store. Contact your local Wayne-Dalton dealer. To find your local Wayne-Dalton dealer, refer to your

local yellow pages/business listings or go to the

Find a Dealer section online at www.wayne-dalton.com

Trolley Operator

OPERaTOR MusT bE TEsTED aT TIME
Of INsTallaTION aND MONThly
ThEREafTER as DEsCRIbED IN yOuR
INsTallaTION INsTRuCTIONs aND
OWNER’s MaNual, TO ENsuRE ThaT
DOOR safETy fEaTuREs fuNCTION.
faIluRE TO TEsT OR MakE aNy
NECEssaRy aDjusTMENTs OR
REPaIRs, CaN REsulT IN sEVERE OR
faTal INjuRy

1. Install operator rail 1/2” to 1-1/2”

(13 - 38 mm) above high arc of top

section of the door.

2. Mount operator to ceiling so that

1” to 1-1/2” (25 - 38 mm)

clearance is maintained between

trolley rail and top section when

door is fully open (trolley rail will

slope down towards rear).

3. attach door arm to operator bracket

installed in step 14 with clevis and

cotter pin.

4. attach operator to a suitable
mounting surface (2” x 6”) lumber
minimum.

5. attach operator to ceiling framing

members.

IMPORTANT: aNGlEs MusT bE
aTTaChED sECuREly TO fRaMING
MEMbER(s).

WARNING

suITablE MOuNTING

suRfaCE (2” x 6”)

luMbER MINIMuM

OPERaTOR RaIl

ClEVIs PIN

OPERaTOR

fRaMING MEMbERs

PERfORaTED aNGlE

OPERaTOR

RaIl

PERfORaTED

aNGlE

COTTER PIN

DOOR aRM

OPTIONA

l

INST

All

ATION

Advertising