Uncrating and cleanup, Installation, Assembly – Walter Drake JET HBS-916W User Manual

Page 7

Advertising
background image

7

Uncrating and Cleanup

Note: Read and understand the entire manual
before attempting setup or operation.

1. Finish uncrating the saw and inspect for

damage. Should any have occurred, contact
your local distributor.

2. Remove all bolts attaching machine to

shipping base.

3. Leave packing material between vise

clamps and saw head intact until band saw
has been lifted to its final position.

4. Clean all rust protected surfaces with

kerosene or diesel oil to remove protective
coating. Do not use gasoline, paint thinner,
mineral spirits, etc. These may damage
painted surfaces.

5. Lubricate all slideways with SAE 10W oil.

Installation

For best performance, the band saw should be
located on a solid and level foundation. Allow
room for servicing and for moving large stock
around the band saw when deciding a locatio n
for the machine.

1. Using lifting straps that are isolated from the

band saw’s finished surfaces, lift machine
and place in desired location. See Figure 1
for strap placement.

2. Install four leveling bolts with lock nuts on

both sides of the base as shown in the parts
breakdown on page 16, items 2 and 3.

3. Place a level on the table surface and check

side-to-side and front-to-back.

4. Adjust leveling screws until machine is level

in both directions and tighten locking nuts.

Assembly

1. Unbolt the motor assembly from the

shipping crate bottom.

2. Remove nut and washer from the motor

support shaft.

3. Remove shaft (A, Figure 2) from the motor

mount bracket.

Figure 1

Advertising
This manual is related to the following products: