Control installation, Standing pilot boilers — control supplement, Continued – Weil-McLain EG-30 THRU -75 User Manual

Page 11

Advertising
background image

11

Part Number 550-110-032/0607

Standing Pilot Boilers — Control Supplement

1. Mount and wire controls per wiring diagram, page

10, and Figure .

a. Attach junction box inside left jacket panel with

#8- x ½” machine screws and green ground nuts
provided.

b. Install transformer with plug-in relay receptacle. In

Canada, use chain and hook strain relief.

c. Operating and limit circuit wiring must be 18 gauge

or heavier.

. Bring supply wiring to boiler. Must be 1 gauge or

heavier.

. Proceed to page 1.

Figure 7

EG-75 steam boilers with float-type low water cutoff

EG-30 thru -65 steam boilers with float-type low water cutoff

Control installation

continued

1. Mount and wire controls per wiring diagram, page

10, and Figure .

a. Attach junction box inside left jacket panel with #8-

x ½” machine screws provided.

b. Install transformer with plug-in relay receptacle.
c. Operating and limit circuit wiring must be 18 gauge

or heavier.

. Bring supply wiring to boiler. Must be 1 gauge or

heavier.

. Proceed to page 1.

Figure 6

For your safety, turn off electrical power supply and turn off external gas supply valve before attempting to work on the

boiler. Failure to comply can cause severe personal injury, death or substantial property damage.

Advertising
This manual is related to the following products: