Troubleshooting — procedure, Service & maintenance – annual start-up, Cleaning boiler heating surfaces – Weil-McLain Gold CGa User Manual

Page 49: Gold cga gas-fired water boiler — boiler manual, Before troubleshooting

Advertising
background image

Part Number 550-101-009/0107

49

GOLD CGa Gas-Fired Water Boiler — Boiler Manual

Cleaning boiler heating surfaces

1. Shut down boiler:

• Follow “

To Turn Off Gas to Appliance

” in-

structions on boiler and

Lighting or Operating

instructions

.

• Do not drain boiler unless it will be exposed

to freezing temperatures. If using antifreeze in
system, do not drain.

. Follow shutdown procedure.
3. Remove venting system connection to boiler.
4. Remove top jacket panel. Turn back insulation.
5. Remove flue collector. Clean sealant from assembly

and sections.

. Remove radiation plates hanging between sections.

. Remove burners from base. Brush and vacuum

burners to remove all dust and lint. Verify that all
burner ports are free of debris.

8. Place newspapers in base of boiler to collect soot.
9. Clean between sections with wire flue brush.
10. Remove newspaper and soot. Vacuum or brush base

and surrounding area.

11. Reinstall radiation plates.
1. Replace collector box/transition assembly. Seal with

sealant. Obtain gas-tight seal to prevent flue gas
spillage and carbon monoxide emissions, resulting
in severe personal injury or death.

13. Replace insulation and jacket top panel.
14. Start up boiler following Section

6

of this manual

and the boiler

Lighting or Operating instructions

(Section

8b

or

9b

). Excessive sooting indicates

improper gas combustion. If found, check for proper
combustion and make any necessary adjustments.

Before troubleshooting:

1. Have the following items:

a. Voltmeter that can check 10 VAC and

4 VAC.

b. Microammeter with a minimum scale

range of 0-5.

c. Continuity checker.
d. U-tube manometer.

. Check for 10 VAC (minimum 10 VAC to

maximum 13 VAC) to boiler.

3. Make sure thermostat is calling for heat and

contacts (including appropriate zone controls)

are closed. Check for 4 VAC between thermo-

stat wire nuts and ground.

Troubleshooting — procedure

11a

Label all wires prior to disconnection when servic-

ing controls. Wiring errors can cause improper and

dangerous operation.

Never jumper (bypass) rollout thermal fuse element

or any other device except for momentary testing

as outlined in

Troubleshooting Charts

. Severe

personal injury, death or substantial property

damage can result.

Burner access panel must be in position during

boiler operation to prevent momentary flame

rollout on ignition of main flame. Severe per-

sonal injury or substantial property damage will

result.

See pages 50 through 59 for additional trouble-

shooting information.

The boiler contains ceramic fiber and fiberglass materi-
als. Use care when handling these materials per instruc-
tions on

page 68

of this manual. Failure to comply

could result in severe personal injury.

Service & maintenance – annual start-up

(cont.)

10b

Advertising