CGs-4E Gas-Fired Water Boiler — Boiler Manual

Gas piping

5

Table 4 Pipe capacity for 0.60 specific gravity natural gas

Gas

pipe

length

(feet)

Capacity of pipe for pipe size of:

(Capacity in cubic feet gas per hour)

½”

¾”

1”

1¼”

1½”

10

132

278

520

1050

1600

20

92

190

350

730

1100

30

73

152

285

590

860

40

63

130

245

500

760

50

56

115

215

440

670

75

45

93

175

360

545

100

38

79

150

305

460

150

31

64

120

250

380

Natural Gas:

1. Refer to

Table 4

for pipe length and diameter. Base

on rated boiler input (divide by 1,000 to obtain cubic
feet per hour).

Table 4

is only for gas with

specific

gravity 0.60, with a pressure drop through the
gas piping of 0.30” w.c.

For additional gas pipe

sizing information, refer to ANSI Z223.1 (or B149.1
or B149.2 for Canadian installations).

2. Inlet pressure required at gas valve inlet:

• Maximum: 13” w.c.
• Minimum: 5” w.c.
• Manifold gas pressure: 3.50” w.c. at high fire

(0.90” w.c. at low fire while in low fire at start-

up)

3. Install 100% lockup gas pressure regulator in supply

line

if inlet pressure exceeds 13” w.c.

Adjust for

13” w.c. maximum.

Propane Gas:

1. Contact gas supplier to size pipes, tanks and 100%

lockup gas pressure regulator.

2. Adjust propane supply regulator provided by gas

supplier for 13” w.c. maximum pressure.

3. Inlet pressure required at gas valve inlet:

• Maximum: 13” w.c.
• Minimum: 11” w.c.
• Manifold gas pressure: 10” w.c. at high fire

(3.50” w.c. at low fire while in low fire at start-

up)

Connecting gas supply piping to boiler

1. Remove jacket front panel and refer to

Figure 14

to pipe gas to boiler.

a.

Install drip leg

at inlet of gas connection to boiler. Where local

utility requires drip leg to be extended to the floor, use appropri-

ate length of pipe between cap and tee.

b.

Install ground joint union

for servicing, when required.

c.

Install manual shutoff valve

in gas supply piping outside boiler

jacket when required by local codes or utility requirements.

d.

In Canada

— When using manual main shutoff valve, it

must be

identified

by the installer.

2.

Support piping

with hangers, not by boiler or its accessories.

3.

Purge all air

from gas supply piping.

4. Before placing boiler in operation,

check boiler and its gas connection

for leaks

.

a.

Close manual main shutoff valve

during any pressure testing at

less than 13” w.c.

b.

Disconnect boiler and gas valve from gas supply piping

dur-

ing any pressure testing greater than 13” w.c.

Do not check for gas leaks with an open flame

use bubble test. Failure to use bubble test or check for

gas leaks can cause severe personal injury, death or

substantial property damage.

5.

Use pipe dope compatible with propane gases.

Apply sparingly

only to male threads of pipe joints so that pipe dope does not block gas

flow.

Failure to apply pipe dope

as detailed above can result

in severe personal injury, death or substantial property

damage.

Figure 14 Gas supply piping