Operation – Zenoah G3000 User Manual

Page 10

Advertising
background image

10

FUELING THE UNIT (OP1)
1. Remove the fuel tank cap and pour fuel into the

tank up to 80% of full capacity.

2. Fasten the fuel cap securely and wipe up any

fuel spillage around the unit.

3. Remove the oil tank cap and pour chain oil into

the tank. Fasten the cap securely.

1. Select bare ground for fueling.
2. Move at least 10 feet (3 meters) away from the

fueling point before starting the engine.

3. Stop the engine before refueling the unit.

STARTING ENGINE

Keep clear of the saw chain as it will start
rotating upon starting of the engine.

1. Push the primer pump until fuel flows out in the

clear tube. (OP2)

2. Put the ignition switch to “ I ” position. (OP3)

3. While holding the throttle lever together with the

throttle interlock, push in the side button and
release the throttle lever to hold it at the start
position. (OP4)

4. Pull out the choke knob to the closed position.

(OP5)

When restarting immediately after stopping the
engine, Ieave the choke knob at the open position.

NOTE

WARNING

WARNING

7. Operation

OP1

OP2

OP3

OP4

OP5

Advertising