Installation – installing the power pack – Zephyr AK8100AS User Manual

Page 12

Advertising
background image

10

www.zephyronline.com

Installation –

Installing the Power Pack

1. Install optional AK08xxAS Stainless Steel Liner. Review

manual included with liner for more details.

2. If no liner is used cut out an opening in the bottom of the

cabinet by following the dimensions in FIG 1.

3. Lift Power Pack into opening and ensure locking clip has

locked into position. (locking clip is located on left side of
Power Pack. FIG 2

4. Fasten (2) M4 screws into each long side of Power Pack.

If a liner is used the screws will go through the Power Pack
mounting holes, then the liner and into the wood base.
note: Wood blocking may need to be added to cabinet
base if additional support is needed. see FIG 3 and FIG 4

5. Install duct work and seal with duct tape.

7. Install electrical.

8. Remove all packing materials before using Power

Pack. Switch power on and check for leaks around duct
tape.

9. Install fi lter.

CAUTION: At least two installers are

required due to the weight and size of the
hood.

!

Ductwork

wood base

wood base
2” minimum

secure (2) M4 screws to mounting
holes on each long side of Power Pack

metal or other non
combustible material

Ductwork

wood base

wood base
2” minimum

FIG 1

FIG 2

FIG 3

FIG 4

locking clip

mounting holes

controls

front view

right side view

Ductwork

cabinet bottom cut-out size

26

7/8

10

5/8

Power Pack

Stainless Steel Liner

C/L

C/L

Advertising