Post-installation Checklist

43

Follow the parameters defined in Table 42 for binding cables with ties.

Post-installation
Checklist

After you install your switch, use the checklist in Table 43 to verify that your switch
operates correctly.

WARNING: Confirm that you have turned off the power before checking your
installation. Improper connections can injure people or damage components of
the switch.

Table 42 Cable Binding Parameters

Cable Bundle Diameter

Space Between Bundles

10 mm (0.5in)

80-150 mm (3.5 – 6 in)

10-30 mm (.5 – 1.2 in)

150-200 mm (6 – 8 in)

30 mm (1.2 in)

200-300 mm (8 – 12 in)

Table 43 Installation Checklist

Item

Normal

Abnormal (Remarks)

Antistatic wrist strap

Console cable

Ground wire

Power cord

Fabric

I/O module

Fan frame