Performing a control test – Акку-Чек Перформа Нано User Manual

Page 55

Advertising
background image

Performing a Control Test

You need the meter, a test strip, and control solution Level 1 and/or Level 2.
The control level is printed on the bottle label.

1. Insert the test strip into the meter in

the direction of the arrows. The meter
turns on.

2. Make sure the code number on the

display matches the code number on
the test strip container. If you miss
seeing the code number, remove the
test strip and reinsert it into the meter.

53

44702_EN_PNano_24_Ins.indd 53

44702_EN_PNano_24_Ins.indd 53

10/9/09 2:39:00 PM

10/9/09 2:39:00 PM

Advertising