Activeforever Global Lift Rotational Series Reach R450R User Manual

Page 8

Advertising
background image

Step 5: Place the Anchor Sleeve in the cut out area, make sure that the front of the

Anchor Sleeve is 12” to 17” from the water’s edge. (refer to overview) A key element

is to make sure that the Anchor Sleeve is level and square with the pool so that your

Superior Series Lift sits properly on the deck.

Step 6: Bonding the unit – The bonding lug is supplied with the Anchor Sleeve locate

the bonding lug, connect the bonding lug to the bonding grid.
NOTE: Make sure that all local codes and ordinances are met.

Step 7: Pouring your concrete, (make sure you cover the hole on your anchor sleeve

with the plastic cap provided, so you don’t get concrete in the sleeve) a minimum of

4,000 psi concrete with reinforcing rod. Also make sure that the top of the anchor

sleeve is flush with the deck. Before you install your lift make sure you let the

concrete set up for 48 hours.

Step 8: After the concrete has set for 48 hours, now it’s time to install your lift. Place

your Superior Series Lift over the anchor sleeve, once you have completed the

installation, please refer to User’s Manual for a safe operation.

www.ActiveForever.com

Advertising