19. When all data have been acquired press F12 or End to
return to the main interface screen, shown below. The
extraction routine (button #3) will extract all the bytestream
files and output the data into a single text file.

20. After each bytestream file has been extracted, the
message “EOF” will appear. Press enter to continue on to
the next file. Once all the data have been processed,
indicated by a green complete light, click on close window or
F12 to return to main interface.

17. Operational tips:
-Use side-shift function to move probe to new, adjacent
probing location
-Don’t let stringpot cable snap back into spool; factory
stringpot repair will be required if cable retracts too rapidly
-For best results, clear plant residue from probe insertion
area

18. Safety

-Keep hands and feet from underneath probe and sideshift
track area.
-Do not probe where utility lines or other underground
hazards may be present. Use ‘Call before you dig’ services.
- Wear protective gloves and safety glasses or goggles
when working with hydraulic systems.

-Be careful when touching the probe after use; the sapphire
window temperature may cause burns.
-Watch probe deflection and stop probe insertion before
damage occurs. Maximum pressure varies, but can be as
high as 15 mPa. This may occur suddenly if a rock or other
restriction is encountered.

Refer to Operations Manual for
information on steps 4-7

-In sticky clay soils, it may be
necessary to remove soil from
window before reinserting.