Veris Technologies MSP3 - Operating Instructions User Manual

Page 51

Advertising
background image

Pub. #OM17-MSP3

4-31

Figures 78a and 78b

4. Insert pH electrodes into electrode holder. Finger-tighten plastic screws. Install BNC cover

on external controller to keep moisture out of BNC connectors. Leave BNC cover on
whenever unit is outdoors.

5. Row cleaner/coulter: Pull MSP forward and check depth of row cleaner and coulter.

Cleaner should be clearing residue ahead of sampling shoe, but not gouging into soil.

6. Closing disks (if equipped): Adjust closing disks as needed to properly close trench and

bring residue over row-cleaned zone. Do not operate these deeper in soil than necessary.

Figures 80a and 80b

Closing Disks
depth adjustment
pin

Closing disk
angle
adjustments

When wash jets are
properly aligned,
overspray is minimized
and water bubbles out
top of empty electrode
holder as shown here.

When installing BNC cover, route
electrode wires under box; center box
on white pad, and tighten wingnut finger
tight. Keep cover installed even when
electrodes are removed.

Advertising