5 diagnostics, 1 maintenance, 2 failure rectification – VEGA D95 Profibus PA User Manual

Page 31: Fault signals, Troubleshooting

Advertising
background image

Pressure transmitter D95 (Profibus PA)

31

Diagnostics

5 Diagnostics

5.1 Maintenance

Pressure transmitters D95 are maintenance-
free.

5.2 Failure rectification

Fault signals

The pressure transmitter D95 provides maxi-
mum reliability through its self-test and con-
tinuous self-monitoring. If, however, malfunc-
tions occur, the pressure transmitter D95
diagnosis distinguishes between atypical
process conditions and faults in the pressure
transmitter D95.

Atypical process conditions

Exceeding or falling short of measuring
range limits (fault signal extinguishes when
the measured value is again in the measuring
range).

Failure in the D95 pressure transmitter

Failure in the electronics, interference or
damage in the measuring cell.

The following table assists in the analysis of
fault signals.

Cause of

Fault signal via

failure

DOT-matrix

Bar graph
Digital indication

Clearly

"OPERATE

Bar graph 0 %

outside

????

or 100 %

measuring

bar"

digital value

range

flashes

Overload

Bar graph 0 %

range

or 100 %,

of the

digital value

meas. cell

four segments

flash "- - - -"

Failure in

all segments

D95

flash

On instruments with menu-driven adjustment
with additional functions, the possible causes
are displayed under the menu item "Diagnos-
tics no." in case of failure.

Diagnostics

Meaning

no.

1

No frequency from C/D-converter

2

Frequency signal of the capacitor not
within the limit values

3

Frequency signal of the reference
capacitor not within the limit values

4

Frequency signal temperature not
within the limit values

7

Communication with EEPROM dis-
rupted

9

Error in EEPROM CRC-checksum

11

Process connection or electronics
module has been exchanged (ap-
pears for approx. 20 s after switching
on for the first time after exchange)

Troubleshooting

If the displayed value does not correspond
to the level in the vessel or to the process
pressure, the following measures must be
taken:
- check the pressure compensation (only

with gauge pressure measuring ranges)

- check the electrical connections.

Checking pressure compensation

Open the processing unit of the D95 pres-
sure transmitter. The measured value must
not change. However, if the displayed value
changes, compensation of the atmospheric
pressure is not ensured, which can result in
distortion of the measured value. Check the
breather on the processing unit.

Advertising